• Sumset International Trading Co.,Ltd
    Bruno Nascimento
    Thank you for your continued help and support in providing us with high-quality and affordable products.
  • Sumset International Trading Co.,Ltd
    Ehsan Salmari
    Prompt reply and professional attitude make our cooperation smoother!
Contact Person : kerry
Phone Number : 18150137563
Whatsapp : +8618150137563

Woodward TG-13F 8516-039 Turbine Governor with 240VDC Power, 16 N*m Output Torque, and Weatherproof Design

Place of Origin America
Brand Name Woodward
Model Number 8516-039
Minimum Order Quantity 1
Price $4000
Delivery Time 5-7days
Payment Terms T/T
Supply Ability 999
Product Details
Product ID Woodward TG-13F 8516-039 Turbine Governor Brand Woodward
Series 8516-039 Model Number 8516-039
Warranty 1 Year Function Good
Condition New
Highlight

240VDC Turbine Governor

,

16 N*m Output Torque Mechanical-Hydraulic Governor

,

Weatherproof Design Woodward Governor

Leave a Message
Product Description
Woodward TG-13F 8516-039 Turbine Governor
The Woodward TG-13F 8516-039 is a reliable mechanical-hydraulic turbine governor designed for precise speed control in industrial applications. It features speed droop operation for stable and economical performance. The unit is weatherproof, includes a self-contained oil sump, and carries a NEMA 'A' rating for dependable operation in harsh environments. Delivering 16 N·m (12 ft-lb) of output torque over a speed range of 2400 to 4400 RPM, it is well-suited for turbines requiring consistent and accurate speed regulation.
Technical Specifications
Communications Protocol Modbus
Voltage 24VDC
Enclosure Rating NEMA 4
Packing Size 483mm * 310mm * 105mm
Operating Temperature -20°C to +60°C
Output Torque 16 N·m (12 ft-lb)
Speed Range 2400 to 4400 RPM
Product Images
Woodward TG-13F 8516-039 Turbine Governor front view
Woodward TG-13F 8516-039 Turbine Governor side view
Installation Requirements
Professional installation is essential to ensure optimal performance, operational safety, and compliance with industry standards. Proper implementation is critical for reliable system integration and long-term operational efficiency.
  • Professional installation required for optimal performance and safety
  • Ensure proper mounting and adequate ventilation
  • Comply with all applicable electrical safety standards